Construction Progress

  • Ground Floor Structural Work Complete – Rebar, Pour, Cure, and QA Summary

    1. Rebar (Reinforcement) Installation – Completed
    • Steel reinforcing bars were cut, bent, and formed to the specifications of the structural design.
    • Rebar was laid within the formwork on a grout-free reinforcement mat, with intersections securely tied.
    • Vertical starter bars for columns were installed and anchored to the footing cage, ensuring correct positioning prior to the concrete pour.
    • Pre-pour checks were conducted, including formwork stability, rebar placement, cleanliness, and verification of utility rough-ins (plumbing, electrical). All checks completed.
    2. Concrete Pouring – Completed
    • Concrete was poured into the forms in controlled layers to avoid overloading and ensure even placement.
    • Concrete compaction was achieved using a vibrator to eliminate air pockets and produce a dense, high-quality foundation.
    3. Curing and Formwork Removal – Completed
    • Concrete curing methods were implemented to achieve specified strength and durability.
    • Formwork was removed in accordance with the project schedule and concrete strength criteria.
    4. Testing and Quality Assurance – Completed
    • Slump Test: On-site workability test performed to verify the fresh concrete consistency prior to pouring.
    • Compressive Strength Testing: Concrete samples (cubes/cylinders) were collected during pours and tested in a certified laboratory at 7, 14, and 28 days to verify structural strength compliance.
  • Tie Beam Casting

    Before concrete is poured, the real foundation is built through precise formwork and strong reinforcement. Every measurement, every tie, every alignment matters. Because this is where the structure earns its strength.
    At Dashad Construction, we ensure:
    • Accurate formwork for clean, stable shapes
    • Proper reinforcement spacing for maximum durability
    • Strict quality checks before casting
    • Results that stand solid for years 💪
    Strong buildings don't happen by chance—they start with the right preparation.
  • Foundation Concrete & Reinforcement Work

    In the SELARON project, activities continue at full speed even at night...
    Shotcrete Pour (Grobeton):
    • A shotcrete pour was performed to strengthen the foundation substructure's water and load-bearing capacity.
    • The concrete material properties, setting time, and durability were procured and placed under conditions consistent with the project requirements.
    • Vibratory compaction and other necessary processes were applied to achieve surface smoothness and uniformity.
    Foundation Formwork Installation:
    • A formwork system was installed to secure the foundation's shape and load-bearing capacity.
    • The formwork's rigidity, grading, and surface finish were provided in accordance with construction standards.
    • Post-installation inspections verified safe operation and correct dimensional accuracy.
    Foundation Rebar Installation:
    • The installation of foundation reinforcement was initiated and is actively ongoing.
    • Rebar placement adheres to the project master plan, considering connections, overlaps, and reinforcement requirements.
    • After installation, rebar cleaning, tying, and protective measures required by the project are being implemented.
  • Foundation Formwork & Insulation

    Strong foundations are the most important step for robust structures. The foundational works of the SELARON project are being conducted with meticulous care.
    Foundation Formwork Installation:
    • A formwork system was erected to secure the foundation geometry and load-bearing capacity.
    • The rigidity, detailing, and surface finish of the formwork were ensured in compliance with construction standards.
    • After formwork installation, inspections confirmed safe workflow and correct dimensionality.
    Foundation Insulation:
    • Foundation insulation was applied to minimize heat and moisture transfer from the ground.
    • A 4 mm-thick felt-type insulation material was used to achieve target insulation performance and durability.
    • The insulation layer was properly fastened and finished regarding sealability and longevity.
  • Foundation Excavation & Base Preparation

    In our SELARON project, the foundational phase has commenced with excavation and site preparation. Ground exploration and safety measures are in place as we progress in a controlled manner.
    Foundation Excavation:
    • Excavation of the foundation depth and width was carried out at designated sections to appropriate specifications.
    • The soil profile was reviewed to ensure safe bearing capacity and prepared in accordance with the project requirements.
    • Resulting surfaces from excavation were inspected to ensure safe and effective assembly in subsequent stages.
    Blocage Layering and Compaction:
    • The first foundation layer, the blocage layer, was executed in accordance with the project methodology and material standards.
    • To achieve surface levelness and durability, compaction with a roller was performed after laying to homogenize the ground and minimize settlement risk.
    • Post-compaction, surfaces were checked to ensure the target compaction density was achieved.